Extension G3 Fax Board Installation Procedure


Bundled Items

No.Bundled ItemQty
1Extension G3 Fax Board1
2Authentication seal1
important / 重要
  • Authentication seal must be affixed to the exterior of the product (No paste position specified). (Recommended near the manufacturing nameplate).



Installation Procedure
Prepared items
  • Extension G3 Fax Board
  • Gloves
  • Phillips (+) screwdriver


Minimum number of workers

1 person

Caution / 注意

Be sure to check the following precautions before installation.

  • All workers must read the installing procedure together before starting work.
  • Wear easy-to-move clothing, gloves and safety shoes and work with care for injuries etc.
  • Work with sufficient working space.
  • Work in the position with less load, and stop working immediately as you feel that the workload is too large.
  • All work must be done with the power off.
Installation Procedure (LINE1, LINE2, LINE3)
Check Point / チェックポイント
  • When installing several extension G3 fax boards, install it in the order of LINE1, LINE2, and LINE3.
  1. Remove the 2 screws and remove the LINE1 or LINE2 or LINE3 cover.

    • : 3x14D/P
  2. Insert the extension G3 fax board and fix it with 2 screws.

    Check Point / チェックポイント