Floor Bridge Unit A
Bundled Items

| No. | Bundled Items | Qty. |
|---|---|---|
| 1 | Floor Bridge Unit A | 1 |
| 2 | FB Paper Guide | 1 |
| 3 | Paper threading position adjustment plate | 1 |
| 4 | Rubber pad | 1 |
| 5 | Clamp | 1 |
| 6 | Screw M3 × 8 | 4 |
Unpacking Procedure
Items to Prepare
- Gloves
- Cutter
Minimum number of workers
1 person
Caution / 注意 |
Be sure to check the following precautions before unpacking.
|
Unpacking Procedure
- Remove the tape and open the top cover.

- Remove the 2 cushioning materials (A) on the top.

- Remove the vinyl cover (A).

- Remove the floor bridge unit A (A).

- Take out the bundled items small box.

- Remove the package (B) from the included small box (A).

- Remove the tape, remove the air bubble packing material, and the FB paper guide (A) and the paper feed position adjustment plate (B).

- Remove the included package (A) and remove all protective tape.

