Inner Finisher Installation Procedure

Caution / 注意

Be sure to check the following precautions before installation.

  • All workers must read the installing procedure together before starting work.
  • Wear easy-to-move clothing, gloves and safety shoes and work with care for injuries etc.
  • Work with sufficient working space.
  • Work in the position with less load, and stop working immediately as you feel that the workload is too large.
  • All work must be done with the power off.
Check Point / チェックポイント

When using the Inner punch unit, install the Inner punch unit before installing the Inner finisher.

Items to Prepare
  • Bundled item of Inner Finisher
  • Bundled Items of Inner Bridge Unit
  • Phillips (+) screwdriver
Installation Procedure

  1. Remove the 2 screws and remove the Front Left Cover (A). (S7:)

    • S7: C.B.STITE(P4), SCREW, 3X10, F/ZN3C
  2. Slide the front decorative cover upper (A) in the direction of the arrow to remove it.
  3. Remove one screw, and remove the front cover upper (A) in the direction of the arrow while pressing the hook. (S7:)

    • S7: C.B.STITE(P4), SCREW, 3X10, F/ZN3C
  4. Remove 1 screw and remove the Polyester file cover plate (A).

    • :3x8D/BK/P
  5. Remove 1 screw and remove the FD Inner Cover Upper (A).

    • : 3x8DW/P
  6. Remove the 2 screws that secure the Ejection paper sensor Assy (A).

    • : 3x8D/BK
    Note / 補足

    The Ejection paper sensor Assy will be removed in a later procedure.

  7. Remove the two cables (A) from the connectors.
  8. Lift the FD frame (A), release the two hooks, and remove it to the left side of the product.
  9. Remove the screw that secures the ground wire (A).

    • : 3x8D/P
  10. Route the ground wire (A) around the guide.
  11. Remove the 4 screws that secure the FD Stacker Assy (A).

    • : 3x8D/P
  12. Hold the position shown in the figure and remove the FD Stacker Assy (A).
  13. Remove the 2 screws and slide the 2 FD Stacker Assy mounting plates (A) in the direction of the arrow to remove them.

    • : 3x8D/P
  14. Remove 1 screw and remove the FD inner cover bottom (A) in the direction of the arrow.

    • : 3x8DW/P
  15. Remove 2 screws and remove the FD Stacker Guide (A). (S1:)

    • S1: C.B.STITE R, SCREW, 3X8, F/ZN3C
  16. Remove the cable from the connector (A), and slide the output detection sensor Assy (B) in the direction of the arrow to remove it.
  17. Pull the lever to open the Right Door Unit (A).
  18. Pull the lever to open the D3 Unit (A).
  19. Remove 2 screws and remove the Paper Guide (A).

    • :3x5D/TBD
  20. Remove the 2 screws fixing the Driven Roller Assy.

    • : 3x8D/P
  21. Remove the Driven Roller Assy (A) by sliding it in the direction of the arrow.
  22. Install the knob unit (A).
    1. Align the two positioning shafts (A) with the two holes (B) in the frame and attach the knob unit (C).
    2. Place the lever (A) on the cam (B).
    3. Push the knob unit (A) in the direction of the arrow and align the two screw holes (B).
    4. Secure the knob unit (A) with three screws.

      • : 3x4D

        Note / 補足

        Use the fixing screws included with the bridge unit.



  23. Install the Paper guide (A) removed in step 19, and secure it with two screws.

    • :3x5D/TBD
  24. Close the D3 unit and Right door unit.
  25. Temporarily place the inner bridge (A) on the frame on the rear side of the main unit.
  26. Connect the two Inner bridge cables (A) to the connector (B) on the main unit.
  27. Push the inner bridge (A) into the body.

    Note / 補足

    If you can't push it into the main body, raise the right side (A) of the inner bridge slightly and insert it.

    Caution / 注意

    If the inner bridge cannot be pushed all the way in, the tip of the inner bridge sheet metal may be deformed.

  28. While avoiding the protrusion (A) on the back of the inner bridge, raise the front side metal plate (B) about 10 mm and push it into the body.


    Note / 補足

    Confirm that the two dowels (A) on the front side of the inner bridge are inserted.

  29. Secure the Inner bridge (A) with five screws.

    • : 3x8D/P
    • : 4x8D/P
    Back side

    • : 3x8D/P
  30. Attach exterior parts 1,2,3.
    1. Align the 2 dowels (A) of the exterior part 1 with the 2 holes (B) in the frame and the ribs (C) with the hooks (D) to attach the exterior part 1.
    2. While supporting exterior part 1, attach exterior part 2.
    3. Check that there are no floats at the joints of the parts 1,2.
    4. Fix exterior part 2 with one screw.

      • : 3x8xD/P
    5. Align the two hooks (A) and the two holes (B), and attach the external part 3.
    6. Fix exterior part 3 with one screw.

      • : 3x8xD/P
  31. Place the Inner finisher (A) on the Main Unit and slide it all the way to attach it.
  32. Lock the casters (if an additional cassette or caster table is installed).
  33. Hold the red square part and push in the inner finisher (A).


    Note / 補足

    This procedure must be performed under the following conditions.

    • The printer is not moving.
    • The inner finisher is pushed all the way in and not pulled out.
  34. Secure the Inner finisher (A) with two screws.

    • : 4x8D
  35. Align the 4 dowels (A) with the holes and attach the finisher tray (B).
  36. Secure the finisher tray (A) with 2 screws.

    • : 4x8DC/BK/P
  37. Pull out the inner finisher (A) and open the inner front cover (B).
  38. Insert the staple cartridge (A) into the staple unit (B).
  39. Close the inner front cover (A) and push the inner finisher (B) all the way in.