Floor Bridge Unit B
Bundled Items

| No. | Bundled Items | Qty. |
|---|---|---|
| 1 | Floor Bridge Unit B | 1 |
| 2 | Screw M3 × 6 | 5 |
Unpacking Procedure
Items to Prepare
- Gloves
- Cutter
Minimum number of workers
1 person
Caution / 注意 |
Be sure to check the following precautions before unpacking.
|
Unpacking Procedure
- Remove the tape and open the top cover.

- Remove the bundled small bag (A).

- Remove the packing material (A).

- Remove the floor bridge unit B (A).

- Remove the tape (A) and spread the cushioning material.

- Remove all the tapes.

